【Full house renovation project schedule, budget and process reference】
分享
Home renovation in Hong Kong involves a wide range of construction items, and there are no uniform standards for the duration, budget, and process. A full home renovation generally involves multiple stages, including demolition, plumbing and electrical work, tiling, carpentry, painting, custom furniture, and final inspection and handover. The duration and budget vary depending on the unit area, design requirements, and quality of materials. Currently, the average reference price for renovation in Hong Kong is approximately $1,000 per square foot, with actual prices ranging from $600 to $1,200. In addition to construction costs, it also includes project management costs. In terms of duration, a small unit can be completed in as little as 40 days, while a large unit may take 3 months or more.
Full Home Renovation for a 300-Square-Foot Unit:
A 300-square-foot unit is typically a one-bedroom residence. The goals for a full home renovation or refurbishment are usually storage, practicality, and simplicity. The renovation process includes the complete demolition of existing renovations, leveling of walls and floors, plumbing and electrical upgrades, basic tiling repairs, painting, and simple carpentry. The budget is approximately $150,000–$180,000, with custom furniture costing at least $40,000–$60,000. The standard duration is about 1–1.5 months. Design details such as an open-plan kitchen, hidden storage, and fold-down beds can be added according to the budget to avoid exceeding the budget due to unplanned upgrades.
Full Home Renovation for a 400-Square-Foot Unit:
400-square-foot units are commonly found in city-center one- or two-bedroom units. The renovation process and items include demolition, re-laying of plumbing and electrical systems, full-house plastering, tile laying, window and door upgrades, kitchen and bathroom refurbishment, painting, cabinet making, and installation of home lighting fixtures. The budget ranges from $250,000 to $320,000, depending on the materials and design complexity. The common market price is around $300,000 or more (reaching $360,000–$380,000 with custom furniture and high-end materials). The duration is usually 45–70 working days (2–2.5 months). Shortages of custom furniture or tiles may cause delays.
Full Home Renovation for a 600-Square-Foot Unit:
A 600-square-foot unit is a mainstream medium-sized family home type. The renovation process is more diverse, and the design can include separate living rooms and bedrooms, with major changes to the kitchen and bathroom layouts. The budget is generally $380,000–$580,000, which may increase due to the addition of windows, partition changes, and full-house custom furniture. According to common quotations, tiling costs $80,000–$100,000, plumbing and electrical work from $70,000, custom furniture from $100,000, and painting from $30,000. The standard duration is about 2–3 months. The more complex the design requirements and the higher the quality of materials, the longer the duration.
Full Home Renovation for an 800-Square-Foot Unit:
Units of 800 square feet or more are commonly found in private buildings or duplex units. The overall renovation scale is large, and medium- to large-scale users will emphasize design and zoning. Costs for full-house demolition, plumbing, electrical work, tiling, room partitioning, corridor detailing, bathroom refurbishment, kitchen reconfiguration, additional storage, air conditioning installation, and custom furniture are all higher. The budget is approximately $500,000–$750,000. If high-end materials and outsourced professional processes (such as smart home systems and eco-friendly materials) are selected, the total price may increase further. The standard duration is about 3 months, which may easily extend to 100 working days. Attention should be paid to the building management's application for scaffolding and special engineering arrangements.
Full Home Renovation for a 1,000-Square-Foot Unit:
1,000-square-foot units fall into the category of luxury/large units, with living rooms, master bedrooms, guest rooms, studies, double bathrooms, and open-plan kitchen designs becoming mainstream. Full-house demolition costs approximately $15,000–$20,000 or more, plumbing and electrical work from $100,000, tiling from $120,000, and full-house furniture from $180,000. The total budget generally ranges from $700,000 to $1,000,000. The construction process takes 3–4 months. Design details, smart lighting, eco-friendly materials, air conditioning systems, and plumbing and electrical zoning all require the full-time supervision of professional designers and project managers to ensure the quality and living comfort of large units.
Non-Destructive Property Structure Inspection Service
Luxury homes, detached houses, and village houses can undergo structural inspections before a full home renovation to ensure the unit's structure matches the plans.

Click here to learn about Design House HK's non-destructive property structure inspection service
Full Home Renovation Unit Area, Duration, and Construction Cost Budget
| Unit Area (Square Feet) | Duration Budget | Construction Cost Budget |
| 300 Square Feet | 30–45 Days | HK$260,000–320,000 |
| 400 Square Feet | 45–70 Days | HK$300,000–420,000 |
| 600 Square Feet | 60–90 Days | HK$400,000–550,000 |
| 800 Square Feet | 3 Months–100 Days | HK$500,000–750,000 |
| 1,000 Square Feet | 3–4 Months | HK$700,000–1,000,000 |
The duration and budget for full home renovation projects are for reference only. Actual quotations will be adjusted based on the complexity of the on-site construction conditions or the quality of materials used.

Summary of the Full Home Renovation Process and Key Points:
- The process generally is: Design Consultation → Demolition of Existing Renovations → Plumbing, Electrical, and Tiling Modifications → Custom Carpentry → Painting → Equipment Installation → Construction Completion and Inspection → Move-in/Maintenance Follow-up.
- The budget should be arranged according to your own needs and financial budget, and you should set aside a contingency budget of more than 10% in advance to prevent unexpected price increases.
- It is recommended to choose a one-stop design and renovation team that clearly manages and takes responsibility throughout the entire process. The quotation and contract contents must detail all items to avoid construction disputes and prolonged delays.
- Try to communicate expected effects in advance using plans/3D designs. Production and transportation time must be allowed for custom materials (generally 2–6 weeks).
- Pay attention to whether the quotation includes hidden fees, customer protection clauses, etc.
Common Questions About Full Home Renovation in Hong Kong
Q1: Should I arrange my own contractors for a full home renovation, or choose a one-stop full home renovation team?
A: Many homeowners in Hong Kong face two choices when doing a full home renovation: arranging different contractors or a general contractor themselves, or choosing a one-stop full home renovation design and construction team. Although the former may appear relatively lower in construction costs, the homeowner must coordinate the connection of multiple different processes such as demolition, plumbing, electrical work, tiling, and carpentry themselves, and responsibility allocation can easily cause problems. Once a process goes wrong, it is difficult to hold anyone accountable or undo the work. Design House HK's full home renovation team has designers and project managers who coordinate all processes, taking full responsibility from preliminary design, quotation, and material purchasing to construction and inspection. If problems occur, the same team follows up, making it a safer choice and approach.
Q2: What guarantees are there when choosing a registered renovation company for a full home renovation?
A: For undertaking full home renovation projects, there is a big difference in the way responsibility is borne between a renovation team registered as a limited company and a contractor who takes orders in their personal name. Taking on projects in a personal capacity, if construction problems arise, you may have no one to complain to, and the homeowner will have to bear the potential risk of accidents, and it may even involve illegal construction issues.
A registered renovation company will use company assets as the basis for liability. Under normal circumstances, it will purchase project insurance, such as comprehensive project insurance and third-party liability insurance. The contract terms can also specify the warranty period and repair responsibilities, and the entire contract is legally binding, providing greater protection to the homeowner.
Q3: How much contingency should be reserved for a full home renovation?
A: It is recommended to set aside an additional 10% contingency amount on top of the original total budget for the full home renovation. Many old buildings in Hong Kong will reveal hidden problems after demolition, such as wall leaks and aging electrical wiring, which will cause additional expenses or variation orders for the full home renovation. Reserving a contingency can deal with unexpected situations to avoid disrupting the entire full home renovation plan.
Q4: Is it necessary to completely demolish the existing renovation for a full home renovation?
A: Not necessarily. If the unit is not very old and the existing flooring and walls are in good condition, parts of the full home renovation can be retained without removing everything, which can save a portion of demolition and restoration costs. However, if the old building is several decades old, it is recommended todo a full home renovationand completely redo the plumbing and electrical work to ensure future living safety.
Choose Design House HK to create your ideal home and enjoy a worry-free renovation experience!
Design House HK's interior designers have many years of local Hong Kong interior design and renovation experience. The team is equipped with professional designers, project managers, and construction teams, and can tailor design plans for public housing, private buildings, village houses, or duplex luxury homes to perfectly match different unit structures and the homeowner's unique lifestyle and taste. Design House HK insists on high-quality service and transparent pricing, with project managers and designers following up on every full home renovation project. They establish the direction with the homeowner using 3D spatial drawings, allowing the homeowner to make a decision only after seeing the realistic effect. In addition, from custom furniture, lighting, smart homes, air conditioning, bathroom and kitchen waterproofing and mold prevention, cold and hot water and electrical engineering, to the selection of green building materials, every detail is fully taken care of. The project manager will communicate requirements repeatedly with the homeowner, and before the design is completed, the budget, details, and schedule are clearly defined, avoiding common renovation troubles. If unexpected situations arise during construction, Design House HK will immediately mobilize contractors and materials to avoid significant delays in the construction period. The renovation process is comfortable and stress-free. Past services cover interior design and renovation for small units to luxury homes, and all projects are uniformly supervised and maintained by Design House HK, so the homeowner does not have to struggle with construction subcontracting or after-sales issues. Choosing Design House HK for a full home renovation is equivalent to having a one-stop interior design and renovation professional support team, creating a truly ideal, safe, and beautiful home space for you. You are welcome to inquire about our full home design and renovation services at any time.
Click here to WhatsApp us for full home renovation and interior design services